Through this project, they seek to improve access to quality education by reducing the rural infrastructure gap and contributing to local educational development.

Activities Undertaken:

  • Meeting with teaching staff, parents, and community leaders to inform them of the support provided by the Café Femenino Foundation for the construction and furnishing of the classroom.
  • Receipt and evaluation of a proposal from the Lambayeque Educational Management Unit to utilize a prefabricated module located in the community of Kerguer, which was currently unused because the government had already constructed the main school infrastructure.
  • Unanimous decision to opt for the prefabricated module, as it could be dismantled, transported, installed, and furnished in a shorter timeframe than that required for new construction. Furthermore, this option substantially reduced the financial contribution required from the parents.
  • It was agreed that the Women’s Coffee and Quinoa Association—using funds donated by the Café Femenino Foundation—would assume the costs associated with the dismantling, transport, assembly, and installation of the prefabricated module, guaranteeing the following:
    • Receipt of one (01) prefabricated module with platform (delivered by the entity).
    • Clearing of the site designated for the prefabricated module and platform.
    • Transport of one (01) prefabricated module with platform.
    • Site preparation—including the placement of concrete supports, clearing, manual leveling, brush removal, and soil compaction—for the installation of one (01) prefabricated module with platform.
    • Installation of the platform for one (01) prefabricated module.
    • Installation of one (01) prefabricated module onto its platform.
    • Supply and installation of one (01) door lock (including handle) for one (01) prefabricated module with platform.
    • Supply of consumable materials required for the installation of one (01) prefabricated module with platform.
    • Supply and installation of new electrical wiring and fixtures for one (01) prefabricated module with platform.
    • Supply and installation of residual current devices for one (01) prefabricated module with platform.
    • Supply and installation of one (01) floodlight for exterior lighting for one (01) prefabricated module with platform.
    • Supply and installation of six (06) LED light fixtures for one (01) prefabricated module with platform.
    • Supply and installation of one (01) LED emergency light fixture for one (01) prefabricated module with platform.
    • Supply and installation of electrical cabling for lighting and power outlets for one (01) prefabricated module with platform.
    • Supply and installation of one (01) ground rod kit for one (01) prefabricated module with platform.
    • Supply and installation of one (01) fire extinguisher for one (01) prefabricated module with platform.
    • Supply of vertical downspouts for rainwater drainage for one (01) prefabricated module with platform.
    • Installation of a rainwater drainage system for one (01) prefabricated module with platform.

Objectives and Benefits:

  • 17 children served in their first year of secondary school. 15 youth served in their second year of secondary school. 32 youth provided with quality education.
  • Youth aged 11 to 14 are the direct beneficiaries; they will no longer have to walk 6 to 8 hours daily, thereby allowing them to dedicate more time to their studies.
  • Direct Beneficiaries: 32 youth, 60 parents, and 10 teachers.
  • Indirect Beneficiaries: 500 people.

Project Outcomes:
Completion of the second-level school in Tallapampa contributes to the improvement of education for youth across four communities within the San Mateo de Penachi communities.